How does an AI pilot project work?
An AI pilot project at appDev takes six to eight weeks: in week 1 the use case is sharply scoped and the success criteria are defined, in weeks 2–6 the solution is built and integrated into your systems, followed by testing against real data, code handover and an AI Act check. At the end, the software runs in production in your systems — at a fixed price from 39,000 €.
- to production
- 6–8 weeks
- scoping + success criteria
- Week 1
- fixed price
- from €39,000
- read
- 5 min
Week 1: Scope the use case, clarify the data, define success criteria
The pilot starts not with code but with a sharp cut. In the first week we decide together what the solution has to do in the end — and what is deliberately left out.
- Scope the use case: a single, clearly described application — for example “read incoming invoices and hand them to the ERP in structured form”. Everything else is noted down but not built.
- Define the data sources: which systems, documents and interfaces the solution needs, who provides access, and which sample data serves development and testing.
- Agree on success criteria: how acceptance will be measured in the end is put in writing before the first line of code is written. That protects both sides from arguments in week 6.
Weeks 2 to 6: Build, integrate into your systems, set up EU hosting
The longest phase is development. It doesn’t happen behind closed doors: you see interim results on your own data and can course-correct before anything heads in the wrong direction.
- Development: the solution is built along the criteria agreed in week 1 — not as a prototype, but as software intended for production use.
- Integration: connecting to your systems (ERP, DMS, CRM or line-of-business application) is part of the pilot. An AI solution with no connection to the real workflow stays a toy.
- EU hosting: in parallel, hosting is set up in the EU, GDPR-compliant with data minimisation and access control — from the start, not bolted on afterwards.
Weeks 6 to 8: Testing against real data, acceptance, code handover
To finish, the solution is checked against the criteria from week 1 — on real data from your day-to-day work, not on hand-picked examples.
- Acceptance on real data: your staff test the solution on real cases. It is measured against the success criteria agreed in advance.
- Code handover: your team receives the complete source code — that’s part of the fixed price. You stay independent and free to switch at any time.
- AI Act check: for the use case delivered, we include a conformity check. For typical mid-market applications the effort involved is manageable.
- Six or eight weeks? If data and interfaces are ready from week 1, going live around week 6 is realistic. Deeper integration or scattered data sources push it towards week 8 — and that shows up during scoping, not only at the end.
What you as the customer need to contribute
A pilot in six weeks only works if both sides deliver. Your contribution is concentrated at the beginning and the end:
- One fixed point of contact: a person who bundles questions and can make decisions about the use case. That keeps coordination short.
- Data access in week 1: sample documents, test data, interface credentials. Delayed access is the typical reason a pilot needs eight weeks instead of six.
- Test users for acceptance: staff from the department who check the solution on real cases in weeks 6 to 8 — they are the fastest to spot whether the result holds up in everyday work.
- IT for the handover: someone who takes delivery of the source code and hosting setup, so the knowledge lands in-house and doesn’t stay with the provider.
How to recognise a good pilot project
Not every “pilot” deserves the name. Four traits separate a solid project from an extended demo:
- Acceptance criteria before you start: written, measurable, checkable against real data. A pilot without criteria agreed up front is a demo with an open ending.
- Production use instead of prototype: the result runs in your systems in the end and is used by your team — not on the provider’s laptop.
- A fixed price for a fixed scope: at appDev from 39,000 €, depending on the state of your data and the depth of integration. Changes to the scope are recorded as a separate step; the agreed fixed price stays stable.
- A clear next step: what comes after the pilot is named — at appDev an optional operations plan from 1,900 €/month with ongoing development and KPI tracking, as a separate module. You decide after the pilot, not before.
FAQ
Frequently asked questions
How long does an AI pilot project take?
At appDev, six to eight weeks to a production-ready solution. Six weeks is realistic if data and interfaces are ready from week 1; deeper integration or delayed access pushes going live towards week eight.
What does an AI pilot project cost?
At appDev, a fixed price from 39,000 € for a scoped use case, depending on the state of your data and the depth of integration. Source-code handover, EU hosting setup and an AI Act check are included. If you want to start smaller: a Discovery for 1,900 €, fully credited when you commission the pilot.
What do you get at the end of an AI pilot?
A production-ready solution in your systems, the complete source code for your team, a GDPR-compliant EU hosting setup and an AI Act conformity check for the use case delivered — accepted on real data against criteria agreed in advance.
How much effort does our team have during the pilot?
The effort is concentrated in week 1 (scoping the use case, providing data access) and the testing phase at the end (checking real cases, taking delivery of the handover). In between, one fixed point of contact who answers questions and reviews interim results is enough.
What happens if the pilot doesn’t meet expectations?
That’s exactly why the use case is scoped tightly in week 1: the success criteria are fixed in writing before you start, and acceptance measures against them on real data. So within a few weeks it becomes clear whether the solution holds up — not only after months and an open-ended budget.